Allocated to Production

This field displays the quantity of an item currently assigned to a job, production schedule, or project, but not yet issued. This amount is the difference between the required and issued quantities for all materials (ignoring type Other) in the material list of all jobs with a status of Released or Stopped, or production schedules with a status of Released.

The Rebalance Item Qty Alloc To Prod And WIP utility recalculates this amount. When you release the job or production schedule, this quantity increases. When you issue a quantity to a job or production schedule, the quantity decreases.