Estimate Materials
Use the Estimate
Materials form to do the following:
- View and maintain information about the materials needed for
a specific estimate job operation.
- Enter cost information for materials for a specific estimate
job.
- Maintain information about each job material (for reference
purposes).
The Estimate Materials Cost tab contains the cost
information for a specific operation.
Use the Estimate Material References tab to view
information about each estimate material. You can enter one record
for each quantity listed on the estimate material record. For example,
if you enter a quantity of four, enter four reference records.
NOTES:
- Estimates do not support co-product
items.
- If the ECN Use for Estimate
BOM/Routings inventory parameter is set to All,
you cannot add or make changes to estimate materials or operations.
- If the estimate job is a Rework
order, the estimate job bill of material can have a material
that is the same as the estimate job's end item. This recursive
BOM structure is allowed only for rework orders.
Related Topics
Defining and Processing a Kit