Job Materials
Use the Job Materials form to:
- view and maintain information about the materials needed for
a specific job operation on the Materials tab.
- enter cost information for materials for a specific job on
the Costs tab. This cost information includes material,
labor, fixed overhead, variable overhead, and outside costs. The
system maintains an accumulated total for each of these cost components.
Use this information to better analyze the cost breakdown of material
to a job.
- maintain information about each job material (for reference
purposes) on the References tab. You can enter one record for
each quantity listed on the Job Material record. For example,
if you enter a quantity of four, you enter four reference records.
NOTES:
- If the ECN
Use for Job BOM/Routings Inventory Parameter is set to
All, you cannot add or make changes to job materials.
- If the job is a Rework
order, the job bill of material can have a material that is
the same as the job's end item. This recursive BOM structure
is allowed only for rework orders.
- The Lots tab is enabled when the job has preassigned lot
numbers.
Related Topics
Creating Routings and Bills of Material
Cross-Referencing Demands to Supplies
Cross-referencing a Job Material to a Job
Defining and Processing a Kit