Select the type of change that will cause the Scheduler to apply setup time for this operation. For example, the resource this operation is using may have been working on a different item or an item from a different setup group before having to set up for working on the item for this operation.
The setup time applied may be a fixed value from the Setup field or may be calculated from the setup matrix referenced in the Setup Matrix field.