Creating APS Alternatives

An alternative is a container for specific data to drive APS and Scheduling. Each alternative represents a "what if" scenario to analyze. You must always have a productionalternative, which is alternative "0." The alternative 0 references your SyteLine application data that you interact with on other forms. The APS Planning and Get ATP/CTP processes use the data in alternative 0.

To investigate possible changes to your process, you must create one or more planning alternatives (such as alternative 1, 2, 3, etc.) in addition to the production alternative.

Creating the Production Alternative

SyteLine provides a blank alternative 0; you must enter the information to reference your data.

  1. Open the APS Sites and Alternative Management form.
  2. Select Actions > New.
  3. In the Alternative field, enter 0.
  4. In the Planning Site field, select the SyteLine site you are defining.
    If you have multiple SyteLine sites that will be included in global planning, you must create a separate alternative record for each site. That is, if you have two sites, A and B, you must create an alternative 0 record for site A and a second alternative 0 record for site B.
  5. In the Priority field, enter the sequence number of this site for global planning.
    When you run APS Planning in global mode, the system plans the site with the lowest Priority number (00) first.
  6. If this is the alternative 0 record for the local site (that is, the site at which you're actually entering the record), in the Type field, select Local. If this is the alternative record for one of the other sites in your environment, select Remote.
  7. In the APS Server Service Host Name field, enter the name of the machine where the Planning and Scheduling Service is running.
    This is typically the SyteLine utility server. See the Infor SyteLine Installation Guide for instructions on installing the Planning and Scheduling Service.
  8. In the APS Server Service Port field, enter the port number on which the Planning and Scheduling Service is installed and running.
    If you do not remember the number of the port on which you installed this service, open the Windows Services applet (Start > Programs > Administrative Tools > Services) on the SyteLine utility server and look for "Infor APS Server"; the port number will be listed along with the service name.
  9. In the Planner Database Host Name field, enter the name of the machine where the planner database is running.
    For instructions on installing and starting planner databases, see the Infor SyteLine Installation Guide.
  10. In the Planner Database Port field, enter the port number on which the planner database is running.
    This field associates the production alternative with the planner database in which the actual planning calculations are performed. This planner database must be running when you perform the Get ATP/CTP process or run APS Planning. For information on creating and starting a planner database, see the Infor SyteLine Installation Guide.
  11. In the SQL Host Name field, enter the name of the machine where the SQL Server is installed. The Planning and Scheduling Service uses this information to connect to the SyteLine application database.
  12. In the SQL Database Name field, enter the name of your SyteLine application database.
  13. In the Timeout field, enter the number of seconds for the system to wait for a response from a remote site when running APS Planning in global mode. Make sure the Timeout value is sufficient--we recommend at least 60 seconds.
  14. Select Actions > Save to save the parameters. It takes several minutes for the save process to complete.

Repeat these steps to enter a production alternative record for each site in your environment.

Creating Alternative Plans

To create a planning alternative, follow the steps listed above for creating the production alternative, and change the steps as follows:

Copying Production Data to a Planning Alternative

After creating an alternative plan, select the new alternative and click Copy/Refresh to copy the data from alternative 0 (the production alternative).